The Problem
Warehouse had water seeping through the slab in a high-traffic storage aisle. Shutting down the aisle would delay orders.
Detection Method
After-hours thermal + GPR scan during overnight shift change. Thermal identified moisture path. GPR mapped in-slab plumbing and confirmed a failed coupling.
Results
Weekend repair during lowest traffic window. Aisle never fully closed. No orders delayed.